pTrack™ alerts you and your team 4-hours ahead of a required curtailment. You will also be notified the day, week and month before a curtailment.
Alerts sent via Text Message, Email, Phone Call and Web-based Portal.
Our NOC (Network Operation Center) and API can send peak alerts to your on-site assets such as a Building Automation System or Battery System to optimize them in real time.
pTrack™ is Edgecom Energy's ICI program peak prediction service for Class A consumers in Ontario. It uses machine learning to accurately predict the top 5 Coincident Peaks (CP’s).
pTrack™ leads to:
More savings with less curtailment effort.
pTrack™ alerts you and your team 4-hours ahead of a required curtailment. You will also be notified the day, week and month before a curtailment.
Alerts sent via Text Message, Email, Phone Call and Web-based Portal.
Our NOC (Network Operation Center) and API can send peak alerts to your on-site assets such as a Building Automation System or Battery System to optimize them in real time.
pTrack™ is Edgecom Energy's ICI program peak prediction service for Class A consumers in Ontario. It uses machine learning to accurately predict the top 5 Coincident Peaks (CP’s).
pTrack™ leads to:
More savings with less curtailment effort.
• Sent monthly
• Long term forecast of expected peaks for the upcoming season
• Summary of expected curtailment events
• Summary of how the Ontario peaks have been changing
• Sent every Sunday
• 12 day ahead forecast of Top 5 peaks
• Projected chance of peak on each day
• Projected peak hour on each day
• Sent a minimum of 18 hours before a potential curtailment
• Sent monthly
• Long term forecast of expected peaks for the upcoming season
• Summary of expected curtailment events
• Summary of how the Ontario peaks have been changing
• Sent every Sunday
• 12 day ahead forecast of Top 5 peaks
• Projected chance of peak on each day
• Projected peak hour on each day
• Sent a minimum of 18 hours before a potential curtailment
• Sent a minimum of 4 hours before a potential curtailment
• Sent out a minimum of 4 hours before a potential peak
• Includes the chance of peak and curtailment period
• Curtailment period is always 4 hours or less
• Notice to resume regular operations after the potential peak event has passed
• Summary of the peak event - was it a peak?
Predicting peaks accurately is an important challenge for Class A customers. Read our white paper to learn more about why Machine Learning is a requirement when predicting peaks.
Read moreSee real-time energy consumption, curtailment effort and dollar savings on the pTrack™ online portal.